FCC Reveals LPFM New Station Tentative Selectees

0

WASHINGTON, D.C. —  The FCC has formally unveiled the tentative selectees from 93 groups of mutually exclusive applications for new low-power FM station construction permits filed during a December 2023 window.


To determine the selectee, the FCC used a point system. “We designate the single applicant with the highest point total or the applicants tied for the highest point total from each mutually exclusive group (MX group) as the tentative selectee(s),” it explained.

An eight-page PDF identifies in bold all of the tentative selectees: attachment A.

A Public Notice released late Wednesday outlined the details of what’s next: On October 16 a 30-day period began for filing petitions to deny against the tentative selectee applications, a 90-day period for the filing of voluntary time-share proposals (point-aggregation requests), and a 60-day period for filing major change amendments.

A second document outlines second-adjacent channel waiver requests, and can be accessed here: second adj waiver.